Bangalore Division came into existence on 27.7.1981.This Division was carved out from the erstwhile Madras and Mysore Divisions of Southern Railway.Division has around 518kms of electrified route and 787kmsof non-electrified track. The Division is on a broad gauge system and encompasses 15 districts of three States:

Sl. No.

State

Districts

1

KARNATAKA

Bangalore Urban, Bangalore Rural, Tumkur, Mysore,Mandya, Ramanagaram, Chikballapur, Kolar & Hassan

2

TAMIL NADU

Krishnnagiri, Dharmapuri, Salem & Vellore.

3

ANDRA PRADESH

Anantapur& Chittoor

 

The division has 1132.818 Route kilometer of track, out of which 787.857Kms are in Karnataka, 173.671Kms in Tamil Nadu and 171.290Kms in Andhra Pradesh.There are total 133 stations, out of which 104 are situated in Karnataka, 14 in Tamil Nadu and 15 in Andhra Pradesh.

 

ROUTE KILOMETERS

 

ROUTE

SECTION

ROUTE KMS

B

Jolarpettai (Excl) – Bangalore city,

Baiyyappanahalli – Dharmavaram (via CSDR,MKJ) &

Krishnarajpuram – Channasandra Bye Pass Line

316.516

D

Bangalore – Mysore, Bangalore – Tumkur,

Salem (Excl)--Baiyyappanahalli, Lottegolahalli-Chikbanavar (Bye pass)

397.520

E

Yesvantpur – Yelahanka, Penukonda – Dharmavaram (excl. via SSPN), Bangarpet – Marikuppam, Yelahanka – Chikkballapur- Kolar – Bangarpet, Baiyyappanahalli cabin - Yesvantpur, Baiyyappanahalli – Banaswadi, Chikbanavar – Hassan via Neelmangala and Shravanbelgola, and Baiyyappanahalli – Vimanapura (Goods only)

418.782



SYSTEM MAP




ENLARGED PORTION OF BANGALORE AREA




JURISDICTION PWI’S – BANGALORE DIVISION



ORGANISATION CHART



CLASSIFICATION OF STATIONS

 

Stations have been classified as A1, A, B, D, E & F the basis of annual passenger earnings:

 

CLASS OF STATION

Annual Passenger Earnings (Rs)

Total No. of Stations

A1

More than 60 Crores

2

A

8 – 60 Crores

5

B

4 – 8 Crores

6

C (Suburban)

-

Nil

D

60 Lakhs – 4 Crores

20

E

Less than 60 Lakhs

66

Flag/ Halts

 

32

Block stations

 

2

Total

 

133























LEVEL CROSSING DETAILS OF THE DIVISION:

The current position of LCs/ROB/RUBs are as follows

SL. NO

DESCRIPTION

AVAILABLE

1

Manned Level Crossings

246

2

Unmanned Level Crossings

6

3

Road Under Bridges (RUBs)

349

4

Road Over Bridges (ROBs)

139

To ensure safety of the passenger and Road users ,division has identified 29 nos. of Level Crossings to be eliminated this year, out of which 11 level crossings had already been eliminated during the year 2017-18.

On all 6 unmanned level crossings, “Gatemitra (trained person)”are available to warn and guide the road users when trains are approaching.

ACHIEVEMENTS OF ENGINEERING DEPARTMENT OF SBC DIVISION IN RECENT PAST;

1.Neelmangala-Sharavbelagola new line (110 Kms)construction had been completed andsection commissioned during the year 2016-17 .. Train service has also started.

2.A1 Class station of Bangalore City andYeshwantpur have been provided with escalators and lifts facilities covering all platforms. It helps physically challenged passengers and rail users to access railway facilities without hindrance.

3.Elimination of Level Crossings is a priority safety area.During last 3 years 86 level crossings had been eliminated (44-Manned & 42 – Unmanned level crossings)

4.53 nosRoad Under Bridges completed during last 3 years .

5.At 73 locations, rain water harvesting had been implemented during the year 16-17, to conserve water.

6.At Bangalore City station Second entry building and New Station Building at Krishnarajpuram was completed and commissioned for passengers during2015-16 .

7.At Bangalore City station, new Foot Over Bridge had been commissioned on 04.02.2016.

8.At Yeshwantpur , Extension of Foot Over Bridge connecting PF 2 to PF 6 at had been commissioned during2015-16;

9.At ChikbanavarandBFW ,Extension of Foot Over Bridge completed.

10.Hoodi&Chinnakota halt stationwere commissioned for the passengers..

11.At 31 stations over Bengaluru Division, extension of Platform Shelter had been completed ( around 6850 sqm).

12.Extension of Platform done around 8526 mtrs in 20 stations over the Division.

13.Raising of Platform to high level completed at 4 stations.

14.Division has provided around 111 nos. (4 seaters)steel benches and 1755 nos. of Granite benches at various stations during 2016-17

15.Toilets have been provided viz, RNN, DKN, HJL, RMGM, MAD,GDP, BFW, YPR, GHL, CRLM, PRNT,TCL, BSM.

16.Lifts provided at Yeshwantpur at Platform no 2&3, 4&5 and 6

17.At Bangalore City, lift has been provided on Platform-8

18.At YeshwantpurEscalators had been provided at Platform 1( both Tumkur and Bangalore city end), and on Platform no 6 , at SBC end.

19.Escalator had been provided at Plaformno 2&3 at Bangalore City station.

20.Division has planted 1.23 lakh tree saplings during 2016-17 . Also, garden has been developed at many stations and one nursery developed at eachsub-division.

Total 11 nos of divyang friendly toilets have been constructed, 6 Nos. at Bangalore City Station and 5 Nos. at Yeshwantpurstation.




Source : South Western Railway CMS Team Last Reviewed on: 26-10-2017  


  SWR Personnel-Web Mail | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.