<!--[if !supportLists]-->1.0<!--[endif]-->TRACK STRUCTURE ON MAIN LINE

Route

Route Km

Running track km

Track structure with

PSC sleepers

60kg Rails

52kg (90UTS) Rails

52kg (72UTS) Rails

D

790.738

910.464

910.464

181.212

658.709

70.543

(at scattered locations)

E

394.080

394.080

394.080

68.300

315.430

10.350

TOTAL

1184.818

1304.544

1304.544

249.512

974.139

80.893  

1.1       LEVEL CROSSINGS

The details of level crossings as on 01.04.2016 over the Division is as under:

Manned

Un manned

Grand Total

Total manned

Engg

Traffic

Interlocked

Non Interlocked

270

206

64

122

147

158

428


<!--[if !supportLists]-->2.0<!--[endif]-->ACTION PLAN FOR ELIMINATION OF UNMANNED LCs

Sl No

Total No of unmanned LCs as on 01.04.2016

158

1

Sanctioned for diversion

03

2

Sanction for elimination by subway/ROB

19

3

Proposed for diversion in LAW 16-17

05

4

Proposed for LHS in LAW 16-17

13

5

Balance LCs to be manned

118

2.1       ACTION PLAN FOR ELIMINATION OF MANNED LCs

Sl No

Total No of manned LCs as on 01.04.2016

270

1

Sanctioned for diversion

01

2

Sanction for elimination by subway/ROB

44

3

Proposed for LHS in 16-17

02

4

Balance manned LCs

223


2.2  Summary of LCs manned, LHS constructed & Unmanned LCs closed during last 3 years

SN

Activity

2013-14

2014-15

2015-16

Target

Actual

Target

Actual

Target

Actual

1

Manning of Unmanned LCs.

2

1

31

1

28

22

2

Construction of LH Subway.

48

28

40

28

28

21

3

Closing of Unmanned LCs.

55

56

40

15

        25

22

4

Closing of manned LCs

-

1

-

1

10

11


3.0 PROGRAMME FOR INCREASING THE SECTIONAL SPEED

SN

Section

Length Km)

Present Speed.

(kmph)

Proposed speed

(kmph)

Status and TDC

1

Hassan-Arsikere

47

60

Km.119-140- 80

Km.140-158-70

Km.158-165-80

CRS sanction received, speed increased w.e.f 01.5.2016  

2

Mysore – Nanjangud

25

75

100

To be processed after ensuring adequate ballasting and through tamping. TDC – 31.10.2016

Nanjangud -Chamarajanagar

35

70

3

Naganahalli-Mysore
(BG New Double line)

6

70

100

Sanction under process at Hqrs.  TDC – 31.7.2016

4

Hassan-Sakleshpur

42

65

80

All identified works have been completed. Proposal will be submitted by 25.05.2016. TDC – 30.9.2016

5

Shimaga Town-Talguppa

97

SMET-KMSI-70

KMSI-ANF-50

ANF-TLGP-70

Km.63/0-90/0-      90

Km.93/0-144/300 -70

Km.144/300-160/0 -100

Proposals submitted to HQs on 12.02.2015. Back reference also replied on 26.02.2016. ballasting in progress. Speed trial with OMS to be conducted. TDC – 31.8.2016

6

Birur – Ajjampura (New Down Line)

19

80

100

Speed increased in Sept 2014

7

 Ajjampura-Hosadurga

(New Down Line)

21

80

100

Proposal submitted to Hqrs on 06.10.2015. TDC – 31.8.2016

8

 Hosdurga-Chikjajur

(New Down Line)

30

100

100

Residual works in progress. CRS sanction to be processed. TDC – 30.9.2016

9

SKLR-SBHR

11.15

30

42/060-48/600 – 50

92/710-97/320 - 60

Proposed to increase the speed in straight stretch. Proposal submitted to Head Qrs. Speed trail to be conducted.

10

Increasing the speed on Turnouts & loop lines.

392.50

40 stns

55 loops

15

30

All pre-requisite works completed between TK-ASK & HRR-UBL and proposal is under process for CRS sanction.  Proposal for JRU-UBL section re-submitted to HQs as per Technical circular No.25.  TDC – 30.9.2016


4.0          RAIL/WELD FAILURES

Description

2013-14

2014-15

2015-16

RF

WF

RF

WF

RF

WF

Division

02

86

01

64

04

72








<!--[if !supportLists]-->5.0<!--[endif]-->TRAFFIC FACILITY WORKS- Work completed

SN

Station

Brief Description of work

Status

1

Chitradurga

Development of Goods platform for 43 BCN

Work Completed

2

Mysore

Extension of two spur lines as two stabling lines

Work Completed

3

Hassan

Provision of concrete paver block surface in loading area

Work Completed

4

Ranibennur

Provision of concrete paver block surface in loading area

Work Completed

5

Habanghatta

Addl. Loop line. (Road 3)

Add. Loop line completed on 13.02.2016

6

MNGT

Provision of concrete paver block surface in loading area bet. Rd 4 & 5.

Work Completed

7

Savanur

Addl. Loop line. (Road 3)

Additional loop line Commissioned on 27.08.2014

8

Tolahunse

Addl. Loop line. (Road 3)

Additional loop line Commissioned on 11.06.2014

9

Gubbi

Addl. Loop line. (Road 3)

Additional loop line Commissioned on 12.03.2015

10

Koravangala

New crossing station bet.HAS-BGPA

Commissioned on 25.01.2014.

11

Bageshpura

Addl. Loop line. (Road 3)

Commissioned on 03.10.2015.


Works to be taken  up/ on Pipe line

1

Kardi

Addl. Loop line. (Road 3)

Revised P.Way plan approved, work being taken up during doubling

2

Adhihalli

Converting of Existing  ‘C’  class station into crossing station

Work under review’. Instead of ‘C ‘ class station, IBH will be provided.

3

Yalvigi

Addl. Loop line. (Road 3)

Work dropped in view of sanctioned doubling between JRU-UBL

4

Saunshi

Addl. Loop line. (Road 3)

Work dropped in view of sanctioned doubling between JRU-UBL.

5

MNGT

Bypass line connecting MYS-ASK line with SBC-MYS line

Work being taken up by CN/Unit and nearing completion

6

MYS

Connecting Rd.No.4 with Rd. No.5&6 on CMNR end

P.Way plan under approval being taken up by Construction.

7

Haliyur

Conversion  of Halt into new Crossing station between AMC-CTA

Work is in progress. TDC – 31.7.2016



6.0  PERFORMANCE IN KEY ACTIVITIES OF THE DIVISION IN THE LAST 3 YEARS

S.No

Activity

2013-14

2014-15

2015-16

Target

Actuals

Target

Actuals

Target

Actuals

1

TRR (P) (KM)

9.25

10.16

0

0

0

0.40

2

TRR (S)

2.60

1.433

0

0.85

0

0

3

TSR (P) (KM)

26.70

36.570

50

47.69

79.32

45.30

4

TSR (S) (KM)

5.50

5.89

3.5

3.254

5.447

2.27

5

ISD(S) (KM)

0

0.00

0

0

0

0

6

Ballast collection (cum)

150000

104659

150000

94643

150000

128435

7

Ballast insertion (cum)

150000

73230

150000

69025

150000

122578

8

Through Weld Renewal (TWR) Km

56.50

13.78

40

15.28

60

62.35

9

Deep Screening (KM)

100

70.481

112.50

61.62

112.5

84.31

10

PSC Layouts  (sets)

T/o-38
Traps-47

T/o-30
Traps-45

T/o-0
Traps-07

T/o-0
Traps-7

T/o-0
Traps-03

T/o-0
Traps-03

11

Collection of Scrap (MT)

4000

3916

2500

2418

1500

1401.31

12

USFD Testing (KM)

3078

3107

3175

3177

3034

3177

13

Removal of PSR

8

4

8

4

10

10


7.0       VACANCY POSITION IN SAFETY CATEGORY

SN

Category

Sanctioned strength

Actuals

Vacancy

1

SSE/P.way

59

32

27

3

JE/P.way

28

49

-21

5

Track Maintener  Gr.I, II, III & IV

2590

2230

469


8.0          BRIEF ABOUT CONSTRUCTION ACTIVITIES

 (i)The section between ASK-RRB-JRU where doubling has been completed, section has been taken over by Open line for regular maintenance.

<!--[if !supportLists]-->(ii)<!--[endif]-->The new Broad gauge line between DRU-CMGR has been taken over by Open line for regular maintenance.

<!--[if !supportLists]-->(iii)<!--[endif]-->Doubling of track is in progress between TK-ASK and JRU-UBL. The division requirement regarding various items pertaining to all departments has already been advised to Construction organization.

<!--[if !supportLists]-->(iv)<!--[endif]-->Upgradation of one halt station - Haliyur into crossing station in JRU-RDG section is being executed by Construction. The work is likely to be completed by 31.7.2016.

<!--[if !supportLists]-->(v)<!--[endif]-->MNGT: Bypass line connecting MYS-ASK line with SBC-MYS line. The work being taken up by CN/Unit and nearing completion. TDC -  31.7.2016

<!--[if !supportLists]-->(vi)<!--[endif]-->MYS: Connecting Rd.No.4 with Rd. No.5&6 on CMNR end. The P.Way plan has been approved by division and is under process at CN/Organization. 

<!--[if !supportLists]-->(vii)<!--[endif]-->Construction of new BG line between CMGR-Belur and SKLR is in progress.

<!--[if !supportLists]-->(viii)<!--[endif]-->Construction of ROB/RUBs in lieu of LC No.27 & 47 in MYS-CMNR section, LC No.84, 198, 199, 227 in TK-UBL section, LC No.46 in RRB-SMET Section and LC No.79 & 89 in MYS-ASK section are being executed by CN/Unit.

<!--[if !supportLists]-->(ix)<!--[endif]-->The doubling of track between RRB-SMET has been sanctioned. Detailed estimate is under preparation.

 


9.0          MONSOON PREPAREDNESS OF THE DIVISION

<!--[if !supportLists]-->(i)<!--[endif]-->Monsoon booklet prepared and monsoon reserve as per yardstick will be ensured by 31.5.2016.

<!--[if !supportLists]-->(ii)<!--[endif]-->Loading of monsoon reserve in wagons: Allotment of wagons requested by CBE at HQ. Loading of monsoon materials will be completed by 31.5.2016.

<!--[if !supportLists]-->(iii)<!--[endif]-->In SKLR-SBHR ghat section, tenders for clearing of likely earth slips during monsoon opened and under finalization.

 

                




Source : South Western Railway CMS Team Last Reviewed on: 28-11-2016  


  SWR Personnel-Web Mail | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.