1.0TRACK STRUCTURE ON MAIN LINE

Route

Route Km

Running track km

Track structure with

PSC sleepers

60kg Rails

52kg (90UTS) Rails

52kg (72UTS) Rails

D

790.738

910.464

910.464

181.212

658.709

70.543

(at scattered locations)

E

394.080

394.080

394.080

68.300

315.430

10.350

TOTAL

1184.818

1304.544

1304.544

249.512

974.139

80.893  

 

 

1.1       LEVEL CROSSINGS

 

The details of level crossings as on 01.04.2016 over the Division is as under:

Manned

Un manned

Grand Total

Total manned

Engg

Traffic

Interlocked

Non Interlocked

270

206

64

122

147

158

428

 

2.0 ACTION PLAN FOR ELIMINATION OF UNMANNED LCs

Sl No

Total No of unmanned LCs as on 01.04.2016

158

1

Sanctioned for diversion

03

2

Sanction for elimination by subway/ROB

19

3

Proposed for diversion in LAW 16-17

05

4

Proposed for LHS in LAW 16-17

13

5

Balance LCs to be manned

118

 

2.1       ACTION PLAN FOR ELIMINATION OF MANNED LCs

Sl No

Total No of manned LCs as on 01.04.2016

270

1

Sanctioned for diversion

01

2

Sanction for elimination by subway/ROB

44

3

Proposed for LHS in 16-17

02

4

Balance manned LCs

223



2.2 SUMMARY OF LCs MANNED, LHS CONSTRUCTED & UNMANNED LCs CLOSED DURING LAST 3 YEARS

SN

Activity

2013-14

2014-15

2015-16

Target

Actual

Target

Actual

Target

Actual

1

Manning of Unmanned LCs.

2

1

31

1

28

22

2

Construction of LH Subway.

48

28

40

28

28

21

3

Closing of Unmanned LCs.

55

56

40

15

        25

22

4

Closing of manned LCs

-

1

-

1

10

11

 

 

 

 

 

 

 

 

 

3.0 PROGRAMMES FOR INCREASING THE SECTIONAL SPEED

SN

Section

Length Km)

Present Speed.

(kmph)

Proposed speed

(kmph)

Status and TDC

1

Hassan-Arsikere

47

60

Km.119-140- 80

Km.140-158-70

Km.158-165-80

CRS sanction received, speed increased w.e.f 01.5.2016  

2

Mysore – Nanjangud

25

75

100

To be processed after ensuring adequate ballasting and through tamping. TDC – 31.10.2016

Nanjangud -Chamarajanagar

35

70

3

Naganahalli-Mysore
(BG New Double line)

6

70

100

Sanction under process at Hqrs.  TDC – 31.7.2016

4

Hassan-Sakleshpur

42

65

80

All identified works have been completed. Proposal will be submitted by 25.05.2016. TDC – 30.9.2016

5

Shimaga Town-Talguppa

97

SMET-KMSI-70

KMSI-ANF-50

ANF-TLGP-70

Km.63/0-90/0-      90

Km.93/0-144/300 -70

Km.144/300-160/0 -100

Proposals submitted to HQs on 12.02.2015. Back reference also replied on 26.02.2016. ballasting in progress. Speed trial with OMS to be conducted. TDC – 31.8.2016

6

Birur – Ajjampura (New Down Line)

19

80

100

Speed increased in Sept 2014

7

 Ajjampura-Hosadurga

(New Down Line)

21

80

100

Proposal submitted to Hqrs on 06.10.2015. TDC – 31.8.2016

8

 Hosdurga-Chikjajur

(New Down Line)

30

100

100

Residual works in progress. CRS sanction to be processed. TDC – 30.9.2016

9

SKLR-SBHR

11.15

30

42/060-48/600 – 50

92/710-97/320 - 60

Proposed to increase the speed in straight stretch. Proposal submitted to Head Qrs. Speed trail to be conducted.

10

Increasing the speed on Turnouts & loop lines.

392.50

40 stns

55 loops

15

30

All pre-requisite works completed between TK-ASK & HRR-UBL and proposal is under process for CRS sanction.  Proposal for JRU-UBL section re-submitted to HQs as per Technical circular No.25.  TDC – 30.9.2016

 

4.0          RAIL/WELD FAILURES

Description

2013-14

2014-15

2015-16

RF

WF

RF

WF

RF

WF

Division

02

86

01

64

04

72

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.0TRAFFIC FACILITY WORKS- Work completed

SN

Station

Brief Description of work

Status

1

Chitradurga

Development of Goods platform for 43 BCN

Work Completed

2

Mysore

Extension of two spur lines as two stabling lines

Work Completed

3

Hassan

Provision of concrete paver block surface in loading area

Work Completed

4

Ranibennur

Provision of concrete paver block surface in loading area

Work Completed

5

Habanghatta

Addl. Loop line. (Road 3)

Add. Loop line completed on 13.02.2016

6

MNGT

Provision of concrete paver block surface in loading area bet. Rd 4 & 5.

Work Completed

7

Savanur

Addl. Loop line. (Road 3)

Additional loop line Commissioned on 27.08.2014

8

Tolahunse

Addl. Loop line. (Road 3)

Additional loop line Commissioned on 11.06.2014

9

Gubbi

Addl. Loop line. (Road 3)

Additional loop line Commissioned on 12.03.2015

10

Koravangala

New crossing station bet.HAS-BGPA

Commissioned on 25.01.2014.

11

Bageshpura

Addl. Loop line. (Road 3)

Commissioned on 03.10.2015.

Works to be taken  up/ on Pipe line

1

Kardi

Addl. Loop line. (Road 3)

Revised P.Way plan approved, work being taken up during doubling

2

Adhihalli

Converting of Existing  ‘C’  class station into crossing station

Work under review’. Instead of ‘C ‘ class station, IBH will be provided.

3

Yalvigi

Addl. Loop line. (Road 3)

Work dropped in view of sanctioned doubling between JRU-UBL

4

Saunshi

Addl. Loop line. (Road 3)

Work dropped in view of sanctioned doubling between JRU-UBL.

5

MNGT

Bypass line connecting MYS-ASK line with SBC-MYS line

Work being taken up by CN/Unit and nearing completion

6

MYS

Connecting Rd.No.4 with Rd. No.5&6 on CMNR end

P.Way plan under approval being taken up by Construction.

7

Haliyur

Conversion  of Halt into new Crossing station between AMC-CTA

Work is in progress. TDC – 31.7.2016


6.0  PERFORMANCE IN KEY ACTIVITIES OF THE DIVISION IN THE LAST 3 YEARS

S.No

Activity

2013-14

2014-15

2015-16

Target

Actuals

Target

Actuals

Target

Actuals

1

TRR (P) (KM)

9.25

10.16

0

0

0

0.40

2

TRR (S)

2.60

1.433

0

0.85

0

0

3

TSR (P) (KM)

26.70

36.570

50

47.69

79.32

45.30

4

TSR (S) (KM)

5.50

5.89

3.5

3.254

5.447

2.27

5

ISD(S) (KM)

0

0.00

0

0

0

0

6

Ballast collection (cum)

150000

104659

150000

94643

150000

128435

7

Ballast insertion (cum)

150000

73230

150000

69025

150000

122578

8

Through Weld Renewal (TWR) Km

56.50

13.78

40

15.28

60

62.35

9

Deep Screening (KM)

100

70.481

112.50

61.62

112.5

84.31

10

PSC Layouts  (sets)

T/o-38
Traps-47

T/o-30
Traps-45

T/o-0
Traps-07

T/o-0
Traps-7

T/o-0
Traps-03

T/o-0
Traps-03

11

Collection of Scrap (MT)

4000

3916

2500

2418

1500

1401.31

12

USFD Testing (KM)

3078

3107

3175

3177

3034

3177

13

Removal of PSR

8

4

8

4

10

10

 

 

7.0       VACANCY POSITION IN SAFETY CATEGORY

SN

Category

Sanctioned strength

Actuals

Vacancy

1

SSE/P.way

59

32

27

3

JE/P.way

28

49

-21

5

Track Maintener  Gr.I, II, III & IV

2590

2230

469

8.0          BRIEF ABOUT CONSTRUCTION ACTIVITIES

i.The section between ASK-RRB-JRU where doubling has been completed, section has been taken over by Open line for regular maintenance.

ii.The new Broad gauge line between DRU-CMGR has been taken over by Open line for regular maintenance.

iii.Doubling of track is in progress between TK-ASK and JRU-UBL. The division requirement regarding various items pertaining to all departments has already been advised to Construction organization.

iv.Up gradation of one halt station - Haliyur into crossing station in JRU-RDG section is being executed by Construction. The work is likely to be completed by 31.7.2016.

v.MNGT: Bypass line connecting MYS-ASK line with SBC-MYS line. The work being taken up by CN/Unit and nearing completion. TDC -  31.7.2016

vi.MYS: Connecting Rd.No.4 with Rd. No.5&6 on CMNR end. The P.Way plan has been approved by division and is under process at CN/Organization. 

vii.Construction of new BG line between CMGR-Belur and SKLR is in progress.

viii.Construction of ROB/RUBs in lieu of LC No.27 & 47 in MYS-CMNR section, LC No.84, 198, 199, 227 in TK-UBL section, LC No.46 in RRB-SMET Section and LC No.79 & 89 in MYS-ASK section are being executed by CN/Unit.

ix.The doubling of track between RRB-SMET has been sanctioned. Detailed estimate is under preparation.

 

 

9.0          MONSOON PREPAREDNESS OF THE DIVISION

(i) Monsoon booklet prepared and monsoon reserve as per yardstick will be ensured by 31.5.2016.

(ii) Loading of monsoon reserve in wagons: Allotment of wagons requested by CBE at HQ. Loading of monsoon materials will be completed by 31.5.2016.

In SKLR-SBHR ghat section, tenders for clearing of likely earth slips during monsoon opened and under finalization.




Source : South Western Railway CMS Team Last Reviewed on: 20-12-2017  


  SWR Personnel-Web Mail | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.