|
SAFETY DRIVES LAUNCHED AT HQ & RAILWAY BOARD’S LEVEL 2025-26
|
|
SD No.
|
Subject
|
Level
|
Period of Time
|
No. of days
|
|
From
|
To
|
|
1.
|
Precaution during Loading & Unloading
|
RB-1
|
01.04.25
|
15.04.25
|
15
|
|
2.
|
Week – Long safety Drive for Apr.25
|
SPL
|
10.04.25
|
16.04.25
|
07
|
|
3.
|
Safety Inspections of all the Points & Crossings
|
HQ-1
|
17.04.25
|
16.05.25
|
31
|
|
4.
|
Fire safety in Trains Motor Coach/ DPC/ Power Car
|
RB-2
|
17.04.25
|
16.05.25
|
30
|
|
5.
|
Safety Inspections of Points & Crossings
|
RB-3
|
21.04.25
|
05.05.25
|
15
|
|
6.
|
Week – Long safety Drive for May.25
|
SPL
|
12.05.25
|
18.05.25
|
07
|
|
7.
|
Preventive measures at Non-interlocked LC Gates
|
HQ-2
|
19.05.25
|
18.08.25
|
31
|
|
8.
|
Inspection of relay rooms
|
RB-4
|
20.05.25
|
03.06.25
|
15
|
|
9.
|
Safety Inspections of Points & Crossings
|
RB-5
|
29.05.25
|
07.06.25
|
10
|
|
10.
|
Counselling of staff in Automatic Signalling Territory
|
RB-6
|
04.06.25
|
18.06.25
|
15
|
|
11.
|
Week long Safety Drive for June, 2025
|
SPL
|
09.06.25
|
15.06.25
|
07
|
|
12.
|
Safety in Trolley Operation
|
RB-7
|
25.06.25
|
09.07.25
|
15
|
|
13.
|
To identify sharp curving Roads, and subsequently running parallel to tracks & provide barricade to protect the track
|
HQ-3
|
26.06.25
|
25.07.25
|
30
|
|
14.
|
Special Safety Drive on SPAD covering all LPs, ALPs, Track Machine Operators and Tower Wagon Operators at all locations
|
RB-8
|
03.07.25
|
01.08.25
|
15
|
|
15.
|
Safety in securing of stabled rolling stock
|
RB-9
|
05.07.25
|
19.07.25
|
15
|
|
16.
|
Safety Inspection of Block Section LC Gates
|
RB-10
|
09.07.25
|
23.07.25
|
15
|
|
17.
|
Week – Long safety Drive for July.25
|
SPL
|
14.07.25
|
20.07.25
|
07
|
|
18.
|
Safety inspection of all brake van of passenger carrying trains to check about safety items
|
RB-11
|
01.08.25
|
15.08.25
|
15
|
|
19.
|
Week Long Safety Drive for Aug.25
|
SPL
|
11.08.25
|
17.08.25
|
07
|
|
20.
|
Availability and Upkeep of completion Interlocking Plans at Relay Room
|
RB-12
|
01.09.25
|
30.09.25
|
30
|
|
21.
|
Shunting Movement of LE/Train in stations having more than one shunt signals in the same direction.
|
HQ-4
|
06.09.25
|
05.10.25
|
30
|
|
22.
|
To ensure Fire Safety of Camping Coaches.
|
HQ-5
|
06.09.25
|
20.09.25
|
15
|
|
23.
|
Week Long Safety Drive for Sept.25
|
SPL
|
12.09.25
|
18.09.25
|
07
|
|
24.
|
Shunting Precautions covering all the shunting locations.
|
RB-13
|
17.09.25
|
01.10.25
|
15
|
|
25.
|
Safety Inspection of Points & Crossings.
|
RB-14
|
22.09.25
|
21.10.25
|
30
|
|
26.
|
Special Safety Drive on SPAD covering all LPs, ALPs, Track Machine Operators and Tower Wagon Operators at all locations.
|
RB-15
|
25.09.25
|
24.10.25
|
30
|
|
27.
|
Prevention of Fire in ODC consignment coming to contact with OHE.
|
HQ-6
|
25.09.25
|
09.10.25
|
15
|
|
28.
|
Week long Safety Drive on Signal Visibility.
|
RB-16
|
27.09.25
|
03.10.25
|
07
|
|
29.
|
Checking of LC Gates in all aspects.
|
HQ-7
|
10.10.25
|
09.11.25
|
30
|
|
30.
|
Week Long Safety Drive for Oct.25
|
SPL
|
13.10.25
|
19.10.25
|
07
|
|
31.
|
Winter Preparedness Drive
|
RB-17
|
03.11.25
|
02.01.26
|
61
|
|
32.
|
Week Long Safety Drive for Nov.25
|
SPL
|
11.11.25
|
17.11.25
|
07
|
|
33.
|
Precaution to be made during foggy weather
|
RB-18
|
26.11.25
|
10.12.25
|
15
|
|
34.
|
Special Safety Drive on Signal Visibility
|
RB-20
|
13.12.25
|
27.12.25
|
15
|
|
35.
|
Week Long Safety Drive for Dec.25
|
SPL
|
08.12.25
|
14.12.25
|
07
|
|
36.
|
To counsel SM / ASM and ESM reg. Train Working
|
RB-21
|
01.01.26
|
15.01.26
|
15
|
|
37.
|
Week Long Safety Drive for Jan.26
|
SPL
|
12.01.26
|
18.01.26
|
07
|
|
38.
|
Intra Railway Audit Inspection of Crew Lobbies and Running Rooms
|
RB-22
|
15.01.26
|
13.02.26
|
30
|
|
39.
|
Safety Inspection of Points & Crossings covering all P&Cs over SWR
|
RB-23
|
19.01.26
|
17.02.26
|
30
|