| |
100% UMID (Unique Medical Identity Card) registration and generation of cards for serving employees – MYS Division is the first division to complete registration for all its 6392 employees in Indian Railways during the month of Nov – 2021, thereby facilitating Medical services to all serving employees and their dependents.

- Productivity Linked Bonus for 5693 employees for Rs.9.69crore was passed in one day with the combined efforts of Accounts Department and Personnel Branch.
|
- 26 Long pending Audit paras were cleared in a record time of 5 months with the efforts of Accounts Department and respective Executive departments.
|
- Implemented the high transparency in Accounts working wherein it has created intranet modules for Finance, Bill passing, Budget, Establishment, Pension, PF and NPS sections and the information is readily accessible and available for any one in Railway network.
ENVIRONMENT
ØTo comply the directives of the Hon’ble NGT guidelines, Consent for Operation (CFO) form Karnataka State Pollution Control Board was obtained for all 12 stations of MYS division (NSG 2, 3 & 4), and MYS Division is the first to get CFO, among all Railway Divisions.

|
- For making an urban forest near RH/MYS, 1500 saplings were planted in collaboration with M/s Schneider Electric India and CommuniTree on 22.10.2021
- As part of awareness against the usage of single use plastics, an ant-plastic campaign was conducted in the division for a period of two months with the participation of SMRs, TTEs, CHIs, SSEs and RPF personnel.
|
- Swachata Pakhwara campaign-2021 was observed throughout the division from 16.09.2021 to 02.10.2021, swachhta pledge, awarenss rally, nukkad nadak, shramdan, inspections, intensive cleaning stations and Railway premises, trainings for the staff, online competitions etc were conducted during the period.
|
- 2810 saplings were planted during last year.
Technical achievement: -
|
Ø
|
For Un-Interrupted Power Supply for the signaling system, Conventional power supply system has been replaced with IPS system. 02 Nos. installed and commissioned at BBNH & AMSA stations.
[
|
|
Ø
|
For Tracking Arrival & Departure timings of Trains automatically, Control Office Application was commissioned at the 03 stations KBPR, SBHR & JRU.
|
The Train traffic control communication is a vital communication between controller at divisional HQs and station master at way station for efficient train operations. The existing system of working in Mysore division was of analog communication in OFC media using STM/PD Mux in each way stations.
This has been replaced by the VOIP based Train Control Communication System which uses the standard modern and widely proven Internet Protocol technology as a platform having higher clarity and reliability.
Advantages: -
·Better call quality
·No Noise
·Monitoring of system up to the end point.
·Identifying the failure before station master complaints.
·Further expansion of system to other boards with minimum expenditure.
·Being on an IP platform, future technology upgrades can be easily adapted to the existing system. Hence, upgrading the existing system will cost less and easy to use.


|
|
|
|