|
Electrical Branch (General Services) is headed by Senior Divisional Electrical Engineer, who is in-charge of power supply arrangements at all stations of Hubli Division. Sr.DEE is the Divisional Electrical Inspectorate discharging the delegated powers of the Chief Electrical Inspectorate of South Western Railway. All power line crossing in Hubli Division is dealt in this office.
Also for all temporary power connection in Railway premises of the division, permission of this office has to be taken. NON-CONVENTIONAL ENERGY SOURCES (SOLAR) AT HUBLI DIVISION 1.TOTAL INSTALLED CAPACITY =1997 KWp 2.TOTAL SOLAR UNITS GENERATED IN 2021-22 = 1828207 KWH 3.PROPOSED SOLAR PLANTS=1310 KWp |

Accessibility Controls