IMPORTANT FACTS AND FIGURES
a) General Power side
SN
Installations
Qty
1
Electrified stations (incl. Halt Stns)
134 Nos
2
Service Lifts
17 Nos
3
Passenger Lifts
27 Nos
4
Passenger Escalators
32 Nos
5
11 KV / 433 V HT Connections
23 Nos
6
DG Sets
40 Nos
7
Pumping installations (Bore Well Pump, Mono-Submersible Pumps, Booster pump)
389 Nos
8
AC Plants – Centralized / Package
Split AC
23 units 433 Nos
9
11kV / 415V Transformers / CSS
51 Nos
10
Solar installation
1.35 MWp
11
Solar pumps
16 Nos
12
750V in pitlines
12 Nos (All are covered)
b) Primary Coach Holding
A
SGCOACHES
i
AC
0
39
16
55
ii
Non-AC
112
35
147
TotalSG(ICF)Coaches
151
51
202
B
PowerCars
LWLRRM
54
45
107
GoldenChariotPower car
WRRMDAC
iii
LDSLRA
TOTAL
61
47
116
C
LHBCoaches
378
73
653
377
405
86
868
TotalLHBCoaches
755
607
159
1521
D
GoldenChariotEOG AC coaches
E
VandeBharat
24
F
RA1
G
RA6
H
RA7
I
SPIC
J
BD
GRAND TOTAL
1893
National Energy Conservation Award