Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
View Content in Hindi
National Emblem of India

About Us

News & Recruitment

Tenders

Construction Projects

Commercial ,Freight Information & Public Information

For IR Personnel

Contact Us

 
Bookmark Mail this page Print this page
QUICK LINKS
Press Release No. 28726-11-2020
Hubballi
Press Release No. 287, COMMISSIONER OF RAILWAY SAFETY CONDUCTS INSPECTION AND SPEED TRIAL BETWEEN CHIKODI AND RAYBAG STATIONS (13.94 Km)

दक्षिण पश्चिम रेलवे/ SOUTH WESTERN RAILWAY

प्रेस विज्ञप्ति/ Press Release No. 287  Dt: 24.11.2020

COMMISSIONER OF RAILWAY SAFETY CONDUCTS

 INSPECTION AND SPEED TRIAL BETWEEN CHIKODI AND

 RAYBAG STATIONS (13.94 Km)

Shri A. K. Rai, Commissioner of Railway Safety (CRS)/ Southern Circle, Bengaluru conducted statutory inspection of newly laid double line between Chikodi Road and Raybag stations (13.94 Km) as a part of doubling between Londa-Miraj today.  This double line between Raybag and Chikodi is part of the 186 km of doubling of Londa - Miraj project sanctioned in 2015-16 at a cost of Rs.1191 Cr.

CRS conducted Motor trolley inspection of track between Chikodi to Raybag and later speed trial @130 Kmph was conducted. Dy.CRS Shri Srinivas accompanied CRS during the inspection. The speed trial conducted was very smooth.  The inspection commenced from Chikkodi at 09.30 hrs. and finished at Raybag at 12.30 hrs. At Raybag, Station yard and Raybag Station building with passenger amenities was also inspected.

The new BG doubling line is in Belagvi district of Karnataka state and will be opened to simultaneously for goods and passenger traffic between Chikodi Road and Raybag stations. There are 21 Minor Bridges, 4 Road Under bridges and o­ne Canal Bridge o­n this section. o­ne manned Level crossing with Spl Class interlocking has been provided. 

The doubling between Ghatprabha to Chikodi Road (16 Km) was commissioned last year. This section between Kuduchi to Raybag is targeted for commissioning by this financial year. During the period of Late Suresh Angadi, MoSR, this project was being personally monitored by MoSR for improving connectivity between Bengaluru to Mumbai.  Doubling and Electrification work are in progress and o­nce this is completed Bengaluru to Mumbai connectivity will further be strengthened.

Chikodi Station is a four Road station provided with Electronic interlocking with centralized operation of points and signals from operator VDU (Dual VDU) with multiple Aspect colour light signals and motor operated points.

Raybag Station is a five Road station provided with Electronic interlocking with centralized operation of points and signals from operator VDU (Dual VDU) with multiple Aspect colour light signals and motor operated points. 

Shri K C Swami, CAO/CN, Shri Viswas Kumar, Additional Divisional Railway Manager, Hubballi Division, Shri T V Bhusan, CE/CN/II/UBL & Shri G Santhiram, CSTE/CN accompanied CRS for Inspection from Chikodi to Raybag.                 

                                                                    Chief Public Relations Officer                                                                 South Western Railway, Hubballi

                                                 





  SWR Personnel-Web Mail | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.