Press Release No.53311-02-2022
Hubballi
Press Release No.533, TWO MAJOR WORK OF BOX INSERTION HAS BEEN CARRIED OUT IN BETWEEN WANDAL-BASAVANA BAGEVADI ROAD STATION OF GADAG-HOTGI SECTION

 दक्षिण पश्चिम रेलवे / SOUTH WESTERN RAILWAY  
प्रेस विज्ञप्ति / Press Release No.533 Dt: 11.02.2022

 TWO MAJOR WORK OF BOX INSERTION HAS BEEN CARRIED OUT IN BETWEEN WANDAL-BASAVANA BAGEVADI ROAD STATION OF GADAG-HOTGI SECTION

South Western Railway has successfully carried out box insertion work for two major railway works between Wandal- Basavana Bagewadi Road station o­n 09th & 10th February, 2022.  The box insertions were completed for construction of Limited Height Subway In lieu of Level Crossing Gate No.61 & Canal Crossing work at KM 144/200-300 in the section. 

The works were carried out successfully at these two locations by the Engineering team led by Shri Vinayak Padalkar, Senior Divisional Engineer (Central) & Shri Sawan Kumar, Assistant Divisional Engineer, Vijayapura. The entire exercise was monitored by Shri S.P.S. Gupta, Principal Chief Engineer & Shri Arvind Malkhede,  Divisional Railway Manager,  Hubballi.

There were many constraints at the Site like working space, curvature of track, Rocky starta etc.    The work could be completed with meticulous planning. 

The work was executed by Cut and Cover method after introducing Temporary single line working in section. This was challenging as work of excavation along with dressing and leveling which is done normally in 4-5 days under girder was to be completed  in 4-5 hrs. within the block duration. To compound this challenge was the rocky strata which was difficult to cut.

This was done with precise planning and placement of excavators to optimize the output.   Necessary permission was taken to temporarily divert the road traffic of LC No. 61 to LC 62.

On 09.02.22, Line block was availed for o­ne of the  lines in double line track and o­n 10.02.22 Line block availed for the other  for LHS work. During the same period, in same block, work of box insertion for canal crossing has also been carried out near Telgi village of Basavana Bagewadi Taluk of Vijayapura District.   This Canal crossing work was done at the request of Krishna Bhagya Jal Nigam Ltd at a cost of Rs.1.3 Cr.  The Canal is expected to irrigate 5150 hectares of land in Basavana Bagewadi Taluk.  

Adequate no. of manpower & machineries like Cranes, Hitachi Breakers, JCB, Tipper etc. were deployed for executing these works.

            Shri Sanjeev Kishore, General Manager, South Western Railway has congratulated the Engineering team for successful execution of the work completing two major works in the same block with team effort.

                                                                                                                                                                  E̤ Vijaya
                                   Chief Public Relations Officer          
                          South Western Railway, Hubballi 

 






  SWR Personnel-Web Mail | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.